On February 25, 2019, SSSC as the Employer and Unicons as the Contractor organized the commencement ceremony of the project “Construction of Continuous Galvanizing Line with capacity 150,000 tpy at Nhon Trach.” Besides the attendance of the Employer and the Contractor, there were the participants from the Consultant, Chan Phuong Engineering (CPE) and other partners.
The project is built on the area of 29,491 m2 and is SSSC’s third CGL workshop. In 2013, SSSC and Unicons successfully cooperated in the project “Construction of Continuous Galvanizing/Galvalume Line and Continuous Color Line.” Reminding of this good relationship in his speech, Mr. Le Viet, 1st Deputy General Director of SSSC, expressed his optimism and believed that the project would be finished in a safe way, with good quality and as schedule. The sooner the project is finished and put into operation, the higher the economic effectiveness is. It will help increase the total capacity of SSSC to 400,000 tpy to meet the domestic and overseas demand.
On behalf of the Contractor Unicons, Mr. Le Chi Trung, General Director committed to finishing the project sooner than scheduled but still ensuring the standards of safety and quality of the construction.
With the similarity in corporate culture, the enthusiastic engineers and staff, as well as the experience after long-term cooperation, it is believed that SSSC - the Employer, Unicons – the Contractor and CPE – the Consultant and other partners will finish the project successfully and effectively, put the workshop with the advanced technology into operation from Quarter 4, 2020.